There’s been some good progress on The Picture House Project this week!
-
The installation of new external brickwork on our extension is now well underway.
-
Props have been removed throughout the building following the successful installation of new load bearing steels, allowing for the expansion of the foyer and basement.
-
Replastering and repainting has been carried out in areas throughout the building, including the ceiling above the main entrance.
There’s some exciting work around the corner too – including connecting the existing building with the extension, the repainting of the auditorium and revealing the original terazzo tiles in our foyer for the first time!